Building Details
When are the drawings required
In the next 30 days
In the next 60 days
In the next 90 days
No definite timeframe, I'm on a fact finding mission.
Building Density
High Density i.e. Hospital patient floor
Low Density i.e. warehouse or arena
Please pick the boxes beside the items you want us to quote on.
Standard Architectural Items (Wall)
Additional Architectural items (Wall)
HVAC and Plumbing Items
Electrical Items
Fire and Life Safety Items
Medical and Lab Items
Miscellaneous Items
Comprehensive Survey Items (Ceiling)
Area Calculations
Net Usable Area Polylines with drawing text.
Visible wall surface of each room and area on each floor.
BOMA Area Polylines with drawing text entry.
ANSI/BOMA Z65.1-1996 Standard Method for Measuring Floor Area in Office Buildings.
SIOR Area Polylines with drawing text entry.
Standard Method of Establishing Rentable Floor Areas in Industrial Buildings.
Area Report
Net Usable Area Report in PDF Format.
BOMA area report in PDF format.
SIOR area report in PDF format.
Notes and Question